Pareto's Principle - The 80/20 Rule
After Pareto's observation, many other scholars also observed the same phenomenon in their respective areas of expertise.
The 80/20 rule means that in anything few (20 percent) are vital and many (80 percent) are trivial. Juran, the quality management guru, identified that 20 percent of the defects cause 80 percent of the problems. Project managers know that 20 percent of the work consume 80 percent of your time & resources.
Pareto principle (80/20 rule) tells you to focus on the 20 percent that matters. As mentioned earlier, 20 percent is vital. Project managers need to identify that matters and focus on it. That vital 20 percent will produce 80 percent of your result.
Pareto's Principle, the 80/20 Rule, should serve as a daily reminder to focus 80 percent of your time and energy on the 20 percent of you work that is really important.
PMP Books & Reference Material
Books
- PMP Exam Prep, Sixth Edition: Rita Mulcahy - One of the very popular books that is used across the globe for PMP preparation. The language used in this book is very simple and it puts you into situations when you really start thinking through how much have I been using this PMI-ism in my projects. It provides you the tricks of the trade, Study Tips, Games & exercises, Common error & pitfalls, PMI-isms and very good practice exams at the end of each chapter.
- PMBOK Guide 4th Edition - This is the book and you can not avoid it. PMBOK Guide 4th edition is written better than its previous version but it still remains a boring book. You have to go through this book couple of times to understand the concepts. This is the official book for PMP exam but do not count on this book alone. Some topics that appear in the exam are just mentioned there but no details are provided, it is left to the readers to get the details.
- The PMP Exam: How to Pass on Your First Try by Andy Crowe - A self contained book for PMP exam, it provides all the information needed to prepare for the test. This book provides further help by way of providing insider secrets, test tricks & tips, numerous sample questions and exercises for clearing your concepts.
- Head First PMP - This book has been written in a unique way. It is written in a visually rich format. As per Amazon - "Drawing on the latest research in neurobiology, cognitive science, and learning theory, Head First PMP offers you a multi-sensory experience that helps the material stick, not a text-heavy approach that puts you to sleep." It also provides a full length sample exam.
Some other useful books -
- Q & A's for the PMBOK Guide
- PMP in Depth : Project Management Professional Study Guide for the PMP Exam by Paul Sanghera
- Project Management: A Systems Approach to Planning, Scheduling, and Controlling by Harold Kerzner
- Organizing Projects for Success (Human Aspects of Project Management) by Vijay Verma
Practice Questions Collection & Exam Simulator
- PM Fastrack Exam Simulation Software for the PMP Exam: Version 6
- PM FASTrack is an exam simulation software program containing more than 1,400 questions and six testing modes, allowing you to create an unlimited number of different exams. Created with the help of a psychometrician (just like the actual exam) PM FASTrack is designed to simulate the exam and eliminate any surprises. The application also: tracks your progress with printable reports and graphs, provides explanations of answers. - PMP Exam Quicklet: Project Management Professional Practice Exams
- Three complete practice exams, 540 questions, to help you prepare for the Project Management Professional (PMP) exam. Answers are explained in detail, why the correct answers are correct and the incorrect answers are incorrect. - 1000 PMP Exam Questions with Explanations, 5 Full Length 200 Question Exams: Project Management Professional Practice Exams, Based on PMBOK 4th Edition 2009
- 2009 PMP Exam Simulation Software: 6,000 Questions Based on PMBOK 4th Edition.
- PMP Exam Success Series: 3500 Question Exam Simulation
Flashcards
Other Material
Contract Types
- Fixed Price Contracts
- Cost Reimbursable Contracts
- Time & Materials Contracts
Fixed Price Contracts - These type of contracts are negotiated at fixed total price. In such contracts, the scope of work has to be clearly defined. There are provisions of incentives also in these contracts if the requirements stated in the scope of work exceed any quantifiable measurements. On the other hand, if the completed work does not meet the defined standards or any other quantifiable measurement, damages are borne by the seller. In such type of contracts, the seller is at the higher risk.
As per PMBOK Guide 4th Edition, there are three types of fixed price contracts -
- Firm Fixed Price Contracts (FFP) - In this type of contract, the fee is fixed for the products or services. No incentives are given while cost overruns are borne by the seller. Seller is at the highest risk here. Scope of work has to be very clearly defined for such type of contracts. One of the example for this type of contract can be - a purchase order for delivering an off the shelf product for a specified price by a specific date.
- Fixed Price Incentive Fee Contracts (FPIF) - In such contracts, incentives are given to the seller in case the pre defined performance targets are met or exceeded. The performance targets & the financial incentives are decided before the start of the work. In order to safeguard seller's interest, price ceiling is also decided. Any cost above the ceiling is borne by the seller. These contracts motivate sellers to try and get the incentives by way of over performing. One of the example for this type of contract can be - the seller will be given additional 5% of the total price if the required software product is delivered 2 weeks earlier than the specified scheduled date.
- Fixed Price with Economic Price Adjustment Contracts (FP - EPA) - These type of contracts are usually signed where the project duration is spanning over the years. This safeguards the interest of both buyer & seller against any external conditions beyond their control e.g. inflation rate, currency exchange rate fluctuation in case of outsourced projects.
As per PMBOK Guide 4th Edition, there are three types of cost reimbursable contracts -
- Cost Plus Fixed Fee Contracts (CPFF) - In these contracts, the seller is reimbursed the actual cost of performing the work and a fixed fee. This fixed fee is calculated as a percentage of the initial estimated cost. Fixed fee does not change with actual cost.
- Cost Plus Incentive Fee Contracts (CPIF) - In these contracts, the seller is reimbursed the actual cost of performing the work & the incentive fee. This fee is based upon the performance of the seller. Performance is determined based on the pre-defined performance targets.
- Cost Plus Award Fee Contracts (CPAF) - In this type of contract, all the cost of performing the work is reimbursed plus the incentive (award) is given to seller based upon its performance. The point to note here is that - subjective evaluation is done for seller's performance.
- Cost Plus Fee (CPF) Or Cost Plus Percentage of Cost (CPPC) - In this type of contract, seller is paid the actual cost of completing the work plus a fee. This fee is calculated as a percentage of actual cost of completing the work. Percentage is pre-determined but the fee will vary with the actual cost.
Tips for Critical Path, Total Float & Free Float
Today I will talk about the above topics in the subject of the post. Numerical problems are not lengthy and the calculations involved are very simple.
Critical Path - This is the longest duration path in the network diagram but the shortest possible time to complete the project. I am assuming here that you have already prepared the network diagrams and know its basic concepts. Once you have the network diagram ready, look at the each possible path from start to finish, calculate the duration of each path, the path with the longest duration is the critical path. It is possible to have more than one critical paths in a project. More the critical paths riskier the project.
Let's look at an example. Click on the below image to enlarge.

There are three paths -
1. Start-A-C-D-F-H-End = 11 days
2. Start-A-C-E-H-End = 8 days
3. Start-B-G-I-End = 12 days
Path 3 (Start-B-G-I-End) shown in Red is the critical path as this has the longest duration.
Path 1 (Start-A-C-D-F-H-End) is near critical path. A project manager not only should watch out for the critical path but also should concentrate upon the near critical path as this has the potential to become a critical path if not managed well.
Free Float - This is the time by which an activity can be delayed without delaying the early start of its successor activity.
Free float of an activity = (ES of the next activity - EF of that activity) - 1
(Note: -1 is there if you are considering the 1st day of the project as 1 but if you consider the 1st day of the project as 0th day, -1 will be omitted)
Total Float - This is the total time by which an activity can be delayed without delaying the scheduled end date of the project.
Total float of an activity = (LF - EF) of that activity OR (LS-ES) of that activity
Unless specifically asked for free float in questions consider float=total float.
Activities on the critical path have ZERO float.
In the above diagram,
Free Float for activity F = ES of H - EF of F - 1 = 11-10-1 = 0
Total Float for activity F = (LS - ES) of F OR (LF - EF) of F= 11-10 = 1
Free Float for activity E = ES of H - EF of E - 1 = 11-7-1 = 3
Total Float for activity E = (LS - ES) of E OR (LF - EF) of E = 11-7 = 4
More Sample Questions (PMBOK 4th Edition)
Q1 - Project manager acts as a coordinator or expediter in -
A. Weak matrix organization
B. Strong matrix organization
C. Projectized organization
D. Functional organization
Q2 - Due to change in the objectives of an organization the decision was taken to terminate a project. Which of the following project should be terminated -
A. Project where deliverables have been rejected by the client
B. Project where client is satisfied but it does not have a project charter
C. Project where two of the critical resources have left the organization
D. Project which has failed quality control checks
Q3 - You have joined the project mid-way as a project manager as the earlier project manager left the organization. To understand the project success criteria and the sign-off authority, you will look at -
A. Project Statement of Work
B. Project Scope Statement
C. Project Charter
D. Project Management Plan
Q4 - A new technology to develop a software has arrived in the market. As a project manager, you have a visibility into the client's roadmap and are aware that this technology will be used in your project. As a proactive measure, you have trained your resources in that technology. You have implemented -
A. Corrective Action
B. Defect Repair
C. Preventive Action
D. Organization training policy
Q5 - Your team is just about to implement the design when one of your team member approaches you with a new design for software development. This design will reduce the development time by half What is the FIRST thing you will do -
A. Implement the new design
B. Assess the impact of the new design on scope, cost & quality
C. Prepare a change request and take it to change control board
D. Refuse to make any change in the design now
Q6 - Requirements traceability matrix is an output of -
A. Collect Requirements
B. Define Scope
C. Create WBS
D. Control Scope
Q7 - Project scope statement, WBS & WBS disctionary constitute -
A. Schedule Baseline
B. Cost Baseline
C. Risk Baseline
D. Scope Baseline
Q8 - Which of the following BEST describes the purpose of Project Charter -
A. It identifies the stakeholders and their role on the project
B. It provides detailed scope of work
C. It authorizes the project manager to work on the project and apply resources
D. It lists all the risks associated with the project
Q9 - You are working in a construction company and are developing project scope statement for a new project. Which of the following is NOT part of Define Scope -
A. Project Charter
B. Product Analysis
C. Scope Verification
D. Alternatives Identification
Q10 - Which of the following is NOT an output of Close Project Phase -
A. Project Files
B. Final product
C. Project Closure documents
D. Project Statement of Work
Answers
Q1 - A - PMBOK Guide 4th edition P29, Sec 2.4.2
Q2 - B - A project does not have any existence without project charter, hence this should be closed
Q3 - C - PMBOK Guide 4th edition P78, Sec 4.1.3.1
Q4 - C - PMBOK Guide 4th edition P92, Sec 4.4.3.1
Q5 - B - Before taking any change request to Change control board, always assess the impact of the change on scope, cost, schedule and quality.
Q6 - A - PMBOK Guide 4th edition P111, Sec 5.1.3.3
Q7 - D - PMBOK Guide 4th edition P122, Sec 5.3.3.3
Q8 - C - PMBOK Guide 4th edition P73, Sec 4.1
Q9 - C - PMBOK Guide 4th edition P112, Sec 5.2
Q10 - D - PMBOK Guide 4th edition P101, Sec 4.6.3
Here are the links for more practice questions -
- 3500 Question Exam Simulation CD-ROM
- 1000 PMP Exam Questions with Explanations, 5 Full Length Exams: Based on PMBOK 4th Edition
Important Topics for PMP exam - Part 3
What is delegation?
This is a process of distributing the work (authority) to the individuals working on the project without getting away from the responsibility. When the work is delegated, it is expected that the person accepting the work is reliable and will be held accountable for the end results of the assignments. However, the final responsibility still lies with the project manager.
Delegation is not about dumping the work or passing the buck. It should be noted that when the work is being delegated the right authority to complete that work is also delegated but a control is maintained.
Why Delegate?
Vijay Verma, the author of "The Human Aspects of Project Management: Organizing Projects for Success" says -
"Effective delegation is essential in a project environment because of tight schedules and scarce resources. It is important to delegate work in order to increase effectiveness and efficiency in managing a project, reducing the crisis atmosphere. Delegated tasks provide stimulus and opportunities to project team members, improving their participation and interest in the project and possibly opening new horizons for them. In addition, delegation creates more free time for the project manager to work on the most important and critical tasks, as well as, simply, more time to think. Creative thinking by the project manager and interested, challenged project team members helps to avoid the "one-person band" syndrome."
The different aspects to consider while delegating are - to motivate the team, to boost up their morale, to provide them with the challenges, to create successors. Delegation is not about relieving your workload but to allow employees grow professionally. Effective delegation is used to benefit both yourself and the team you are working with.
Following points should be kept in mind while delegating -
- What should be delegated - Not every task a project manager does should be (can be) delegated. Project manager must evaluate the risks before delegating the tasks. The manager should delegate the tasks to free up his time to concentrate on priority activities - routines tasks can be delegated, technical tasks requiring expertise can be delegated, future roadmap planning should not be delegated, key team member selection should not be delegated.
- Clarity of the results - As a manager you must establish the end results out of those tasks. The means to achieve the end results should be left for the individual to decide. Emphasize the goals not the processes or procedures. If for some reason, specific method has to be adopted, it should be informed right at the start of the assignment.
- Defining the responsibility - You as a manager should determine employee's level of responsibility and ensure employee understands this as well.
- Delegating the authority - Major failures in task delegation happens due to lack of authority delegation. Task delegation is done but authority delegation does not happen. Hence, for every small decision employee runs to the supervisor for the approval. Authority required for successful accomplishments of the tasks should also be delegated.
- Establishing the timelines - A clear and agreed upon timeline must be published and milestones should be monitored in project progress reviews.
- Support & feedback - It encourages the employee taking up the tasks if timely feedback is provided alongwith the continuous support. If required, training should also be provided to achieve the set goals.
Also visit:
Important Topics for PMP exam - Part 1
Important Topics for PMP exam - Part 2
PMBOK Guide 4th Edition Sample Questions
Q 1 - Procurement audits are conducted during -
A. Administer Procurement
B. Close Procurement
C. Monitor & Control Risks
D. Perform Quality Assurance
Q 2 - Which of the following is NOT a tool for Define Scope?
A. Product Analysis
B. Alternative Identification
C. Stakeholder Analysis
D. Facilitated workshops
Q 3 - All of the following are Group Decision Making Techniques EXCEPT -
A. Unanimity
B. Negotiating
C. Plurality
D. Dictatorship
Q 4 - You have been assigned the project manager of a project whose earlier project manager has left the organization without proper knowledge transfer. To understand the complete scope of project, you will look at -
A. WBS
B. Project Management Plan
C. Communication Management Plan
D. Performance Reports
Q 5 - All of the following are tools & techniques of Sequence Activities EXCEPT -
A. Precedence Diagramming Method
B. Applying Leads & Lags
C. Arrow Diagramming Method
D. Dependency Determination
Q 6 - Money spent on the project activities during the project to avoid failures is -
A. Cost of Non-conformance
B. Cost of Conformance
C. Failure Cost
D. Cost of Poor Quality
Q 7 - Five stages of team development are -
A. Forming, Storming, Norming, Performing, Adjourning
B. Forming, Norming, Storming, Performing, Adjourning
C. Forming, Norming, Performing, Storming, Adjourning
D. Norming, Forming, Storming, Performing, Adjourning
Q 8 - You have entered into a fixed price contract with a seller but with an understanding that contract cost may change due to currency exchange rate fluctuation. What type of contract is this -
A. FFP
B. FPIF
C. FP-EPA
D. CPAF
Q 9 - You have released an advertisement in a leading newspaper to call for the sellers of a product that is needed to complete your project. Which process are you performing now -
A. Plan Procurement
B. Administer Procurement
C. Outsource Procurement
D. Conduct Procurement
Q 10 - You are the project manager for a software development project. There are 70% chances of making company $240,000 and 30% chances of costing the company $130,000 by doing the project in-house. What's EMV of the doing the project in-house?
A. $168,000
B. $39,000
C. $129,000
D. $207,000
For more numerical and formula related sample questions visit this post. Before attempting those questions, you may want to visit PMP Formulas at a glance.
Answers:
Q 1 - B - Procurement audit is a tool & technique of Close Procurement. PMBOK Guide 4th edition, P343, Sec 12.4.2.1
Q 2 - C - Stakeholder analysis was a tool for Scope definition in PMBOK Guide 3rd edition. This has now become part of Facilitated Workshops, where stakeholder's needs are understood.
Q 3 - B - PMBOK Guide 4th edition, P108, Sec 5.1.2.5
Q 4 - A - PMBOK Guide 4th edition, P121, Sec 5.3.3.1
Q 5 - C - Arrow Diagramming Method (ADM) was tool & technique for Activity Sequencing in PMBOK Guide 3rd edition.
Q 6 - B - PMBOK Guide 4th edition P195, Sec 8.1.2.2
Q 7 - A - PMBOK Guide 4th edition P233, Sec 9.3.2.3
Q 8 - C - PMBOK Guide 4th edition P323, Sec 12.1.2.3
Q 9 - D - PMBOK Guide 4th edition P332, Sec 12.2.2.5
Q 10 - C - $240,000*0.7 - $130,000*0.3 = $129,000
Here are the links for more practice questions -
- 3500 Question Exam Simulation CD-ROM
- 1000 PMP Exam Questions with Explanations, 5 Full Length Exams: Based on PMBOK 4th Edition
PMI Membership Benefits
- Discount on PMP certification exam - When you apply for PMP certification exam as a PMI member the fee is US $405. PMI membership fee is US $129. Total cost becomes US $534. If you apply for PMP exam as non-member, the fee is US $555. There is a direct saving of US $21. It does not require any rocket science to see the benefit of becoming a PMI member.
- Free Access to eReads - As a PMI member you have access to more than 500 books on project management. Along with your knowledge improvement, these books help you in preparing for PMP exam. And, you have access to these books 24x7 free of cost.
- Career Development Services - As member you can advertise your resume and have access to their jobs database. You also have access to career coaching services.
- Networking - You get a chance to interact with 250,000 global fellow community members by way of participating in online discussions, surveys, news. Once you are a PMI member, you can join your local PMI chapter and participate in various events organized by the local chapters and meet the other members in person to know the trends in the profession. These events can fetch you PDUs (after you have cleared the certification) which will help you in continuing your certification.
- Access to various publications - As PMI member you get free subscription to PMI Community post, PMI Today (newsletter), PM network (magazine), Project Management Journal and PMI leadership in Project Management. You also get free access to latest edition of PMBOK Guide.
- Others - Besides above benefits, you also get access to Project management best practices, opportunities to impact the advancement of the project management profession. Also, you can join the SIGs (Special Interest Groups) and participate in the events organized by these groups. It can fetch you PDUs and help in PMP credentials continuation.
Why should I do PMP certification?
But at the same time, over the last decade or so, this has carved a niche and has attained a global recognition among the world corporates. People with PMI certification are marked differently and are placed in a separate category. It has earned a distinction of being prestigious and is considered a benchmark in the industry.
Glance over the below points and then you can decide for yourself, is it worth spending so much money and shall I take this plunge?
Top 5 reasons for getting PMP certification -
1. Knowledge Acquisition - There are not too many formal courses of such repute which will impart you with a formal knowledge of all areas in Project Management. Most of the time, one learns by way of sharing others' knowledge or on the job. This course requires a great deal of study and getting the certification highlights your knowledge of project management processes.
2. More Career Opportunities - Due to its widespread recognition, more & more companies are looking for project managers who are different and the benchmark is PMP certification. Also, imagine a situation of tie between two candidates for a job position, the candidate with the certification will have an edge over the other and you do not want to be that other candidate.
3. Sense of achievement & self-confidence - Believe it or not, after putting in so much of efforts when you see the "Congratulations!" message appear on your screen after the test, it does give you an ecstatic feeling and your confidence gets a real high.
5. Recognition in community & among peers - By completing this certification your name gets added to the most prestigious database of certified professionals in the project management community and you start commanding a different status among your peers also.What do you say now, are you ready to take the challenge?
Memory Aids - PMBOK 4th Edition - Part 2
- 9.1 Develop Human Resource Plan - NOO
- N - Networking
- O - Organization charts & position descriptions
- O - Organizational theory
- 9.2 Acquire Project Team - Present NAV
- P - Pre-assignment
- N - Negotiation
- A - Acquisition
- V - Virtual team
- 9.3 Develop Project Team - Ground rules In Training & Team-building Reduce Controversies
- 9.4 Manage Project Team - PIO Card for Indians
Communication methods is tool & technique in all the communication management processes except identify stakeholders.
- 10.1 Identify Stakeholders - Expert System
- E - Expert judgement
- S - Stakeholder analysis
- 10.2 Plan communications - Communication methods + Requirement Traceability Matrix
- R - Requirement analysis (Communication)
- T - Technology (Communication)
- M - Models (Communication)
- 10.3 Distribute Information - Communication method + Information distribution tools
- 10.4 Manage Stakeholder Expectations - Communication method + Instant Messenger
- I - Interpersonal skills
- M - Management skills
- 10.5 Report Performance - Communication method + Report for Variance & Forecasting
- R - Reporting system
- V - Variance analysis
- F - Forecasting methods
Memory Aids - PMBOK 4th Edition - Part 1
Below are some tips to memorize Tools & Techniques for PMBOK Guide 4th edition processes.
Project Time Management Overview
- 6.1 Define Activities - DRTE - Defence Research Telecommunication Establishments (a part of Canadian Defence Research Board)
- D - Decomposition
- R - Rolling Wave Planning
- T - Templates
- E - Expert Judgement
- 6.2 Sequence Activities - PADS
- P - Precedence diagramming method
- A - Applying leads & lags
- D - Dependency determination
- S - Schedule network templates
- 6.3 Estimate Activity Resources - BEAPP
- B - Bottom up estimating
- E - Expert judgement
- A - Alternatives analysis
- P - Published estimating data
- P - Project management software
- 6.4 Estimate Activity Durations - TAPER
- T - Three point estimates
- A - Analogous estimating
- P - Parametric estimating
- E - Expert judgement
- R - Reserve Analysis
- 6.5 Develop Schedule - SCC WARSS or Schedule may Change With Stakkeholder's Approved Scope Change Request
- 6.6 Control Schedule - VPP WARSS
- 8.1 Plan Quality - CCB Decides Strategy For Changes
- 8.2 Perform Quality Assurance - PQ
- 8.3 Perform quality control - Sensors Help In detecting Fire And Cause Remote Sirens to Play Continously
PMBOK 4th Edition download
Important Topics for PMP exam - Part 2
Besides conflict resolution techniques, another important topic is organizational theories. These theories also draw a fair amount of questions in the exam. Let's look at these one by one.
1. Maslow's Hierarchy of needs -Maslow has defined 5 levels of hierarchical needs. According to this theory one strives, contributes, uses the skills & abilities to fulfill the needs as per this hierarchy. When the needs belonging to a level in the hierarchy are taken care of, one moves on to fulfill the next level of needs before one reaches the last level of self-actualization (the full realization of one's potential) in the hierarchy.
Five layers of needs (bottom-up), as per Maslow, are :
- Physiological - The bare necessities to survive - it includes - air, water, food, shelter, clothes
- Safety - Includes safety and security - security at work, stability in life.
- Social - Love, affection, social circle
- Esteem - Self respect, appreciation,
- Self-actualization - This is the epitome - and here people start realizing their potential and strive for fulfillment by way of personal growth, knowledge attainment.
For further reference, read this article.
3. Expectancy Theory - This theory states that people "in expectation of positive reults" are motivated and put in their best efforts to achieve the goals. e.g. if an individual feels that she will be rewarded if the goal is achieved, that reward becomes the motivating agent and act as a catalyst in improving the performance.
4. Theory X & Theory Y - Douglas McGregor postulated these two theories.
Theory X states that an average individual is not interested in work and always tries to avoid it, does not have any ambition, does not want to take on any responsibility, does not care for organizational goals. These individuals only work for money and security. In order to get any work done from these individuals, they constantly need punishment, close supervision and tight controls.
Theory Y states that employees are self motivated and self directed. For them work is as important as other activities like play & rest in their lives. People take on responsibilities on their own. People align their goals with the organizational goals and need limited supervision.
For further reference, read this article.
Also visit:
Important Topics for PMP exam - Part 1
Important Topics for PMP exam - Part 3
Important Topics for PMP Exam - Part 1
This is one of the very important topics for the PMP exam. Quite a few questions are there in the exam on this topic.
In the project management parlance, following 5 techniques are used by the project managers to resolve any conflict.
- Confrontation - This is the best technique, if any project manager is able to apply this in a conflict situation. This is a problem-solving method in which a project manager is able to resolve the problem itself and both the parties (in conflict) are happy. This is a win-win situation for both the parties.
- Compromising - This is a technique in which one or both the parties (in conflict) sacrifice (give up) something. Negotiations take place to arrive at the solution. Both the parties achieve some degree of satisfaction. This is a loose-loose situation.
- Smoothing - In this technique, areas of commonalities (agreements) are emphasized and areas of conflicts (disagreements) are de-emphasized. It is projected as if there is no conflict at all. This is a temporary solution and the possibility of resurfacing the conflict is very high.
- Forcing - When the power is used to impose upon one's point of view. In this technique, the needs and concerns of the other party are ignored. This leads to win-loose situation where one party wins at the expense of the other party
- Avoiding - Also called withdrawing, in this technique one party withdraws from the situation or, when the issue is postponed without trying to arrive at a solution. This is also a temporary solution as the problem and the conflict both continue.
Some other material on conflict resolution technique is here.
Also visit:Important Topics for PMP Exam - Part 2
Important Topics for PMP Exam - Part 3
My PMP sample questions
A. Ahead of schedule and under budget
B. Behind schedule and over budget
C. Behind schedule and under budget
D. Ahead of schedule and over budget
Q 2 - A project has a total budget of $600,000. As of data date a project shows ACWP as $350,000, BCWP as $400,000 and BCWS as $425,000. Project is running -
A. Ahead of schedule with SPI = 1.06
B. Ahead of schedule with SPI = 1.14
C. Behind schedule with SPI = 0.94
D. Insufficient data to calculate SPI
Q 3 - In the above question, project is running -
A. Over budget with CPI = 0.94
B. Under Budget with CPI = 1.14
C. Under budget with CPI = 1.21
D. Insufficient data to calculate CPI
Q 4 - There are 3 projects to be chosen from. Project A has NPV of $680,000 with a payback period of 6 months, Project B has NPV of $600,000 with a payback period of 3 months and Project C has NPV of $725,000 with a payback period of 12 months. Based on this data, which project should be chosen -
A. Project A
B. Project B
C. Project C
D. Can not be determined with this data
Q 5 - There are 3 projects to be chosen from. Project A has NPV of $32,500, Project B has NPV of $40,000 and Project C has NPV of $45,000. Project C is chosen. The opportunity cost of project C is -
A. $32,500
B. $72,500
C. $45,000
D. $40,000
Answers:
Q1 - B. SPI = EV / PV = 14000/15000 = 0.93 (which is less than 1), hence project is behind schedule. CPI = EV/AC = 14000/17500=0.8 (which is less than 1), hence project is over budget.
Q2 - C. SPI = EV/PV = BCWP/BCWS = 400000/425000=0.94 (which is less than 1), hence project is behind schedule with SPI = 0.94
Q3 - B. CPI = EV / AC = BCWP / ACWP = 400000/350000=1.14 (which is greater than 1), hence project is under budget with CPI = 1.14
Q4 - C. Project C will be chosen as this has the highest NPV.
Q5 - D. Opportunity cost is the cost of next best opportunity.
Here are the links for more practice questions -
- 3500 Question Exam Simulation CD-ROM
- 1000 PMP Exam Questions with Explanations, 5 Full Length Exams: Based on PMBOK 4th Edition
FAQs
- What is the eligibility criteria?
- What is examination fee?
- How much time does it take to process the application?
- Will my application get audited? What is the audit process?
- What is the format of exam?
- Can I reappear for the exam, if I fail to clear in first attempt?
- What is the passing score for the exam?
- Why should I do PMP certification?
- What are the benefits of becoming PMI member?
- How long do I need to wait to get my PMP results?
What is the eligibility criteria?
The eligibility criteria for appearing for PMP is as :
- Diploma or equivalent + 5 years of project management experience + 35 hours of project management training
OR
- Bachelor's degree or equivalent + 3 years of project management experience + 35 hours of project management training
What is examination fee?
Examination fee is:
- If you are a PMI member -
- fee for CBT (computer based online) exam is US $405,
- fee for PBT (paper bsased) exam is US $250
- If you are not a PMI member -
- fee for CBT (computer based online) exam is US $555,
- fee for PBT (paper bsased) exam is US $400
- If you are not a PMI member -
How much time does it take to process the application?
Once the application is submitted on-line, PMI takes around 5 business days to process and review the application. Once the application is reviewed and approved you can immediately apply for the exam through Prometric center. You have one year after the application is approved to apply for the PMP certification exam.
Application process for PBT is much longer.
Will my application get audited? What is the audit process?
Applications are selected at random for verification and audit purpose. Hence, it is not known in advance if the application will be audited. If your application is selected for audit, verification process is initiated. You have to clear the verification process and then apply for the exam. Verification process involves providing evidence for your academic qualification, your professional experience (you provide reference names while filling up the appliction form, they need to verify your professional experience in case of audit)
In case, for any reason, if application is rejected after verification, processing fee of US $100 is deducted and remaining amount is refunded.
What is the format of exam?
There are 200 questions. Format of the exam is multiple choice. 4 choices are given for each question. One of the choice is the correct or the best answer for that question. Time limit for the exam is 4 hrs. There are no specifed breaks, but you are free to take as many as you want, but YOUR TIMER DOES NOT STOP. There is no negative marking. No marks are deducted for wrong answers. Out of 200 questions, only 175 are used for calculating the score. Remaining 25 questions are pre-test unscored questions and one does not know which are those 25. Hence, for all practical purposes one has to concentrate on all 200 questions.
Can I reappear for the exam, if I fail to clear in first attempt?
Yes, you can. Within one year, you are eligible to take the exam three times. For each reappear, you have to pay re-examination fee (US $275 for PMI members and US $375 for non-PMI members).
What is the passing score for the exam?
No one knows. PMI provides the scorecard which only mentions Pass or Fail along with your proficiency level (Proficient, Moderately Proficient or Below Proficient) in each Process Group. But, as the word goes by, one should get minimum 106 questions right out of 175. This is one of the old data which is available as of today but can not be taken as a criteria for pass or fail.
Why should I do PMP certification?
Please visit my post Top 5 reasons for PMP certification for the details.
What are the benefits of becoming PMI member?
Please visit my post Top 5 benefits for PMI membership for details.
How long do I need to wait to get my PMP results?
For computer based test (CBT), you will know your results immediately after completing the test at Prometric center. Prometric center will print out your result and give it to you. Besides mentioning Overall Pass or Fail, this will also indicate your proficiency level in each of the domain. In addition to getting this result by Prometric, you will be able to see your result on the online certification system within 7-10 days. PMI sends you your certificate within 4-6 weeks.
For Paper based test (PBT), you will be able to access your result online within 6-8 weeks of examniation date.
Tips for ITTO - Part - 3
- Communication Planning - Carbon Copy - Communication requirement analysis, Comunications technology
- Information Distribution - ILIC - I Love Indian Curry - Information gathering & retrieval system, Lessons learned process, Information distribution methods, Communications skills
- Performance Reporting - SCIPT - Script without R - Status review meetings, Cost reporting systems, Information presentation tools, Performance information gathering and compilation, Time reporting systems
- Manage Stakeholders - I C - I see or Integrated Circuit - Issue logs, Communication methods
8. Project Risk Management
- Risk Identification - Dangerous ACID - Documentation reviews, Assumption analysis, Checklist analysis, Information gathering techniques, Diagramming techniques
- Quantitative risk analysis - DQ - Data Quest - Data gathering & representation techniques, Quantitative risk analysis & modeling techniques
9. Project Procurement Management -
- Plan purchases & Acquisitions - EMC - Essential Maintenance Contract - Expert judgement, Make-or-buy analysis, Contract types
- Plan Contracting - SE - Start to End - Standard forms, Expert judgement
- Request Seller Response - BAD - Bidder conferences, Advertising, Develop qualified seller list
- Select Sellers - only With Sufficient Information Contractor Should Engage in Procurement - Weighting system, Screening system, Independent estimates, Contract negotiation, Seller rating system, Expert judgement, Proposal evaluation techniques
- Contract Administration - BCCI is Responsible for Power Packed IPL - Buyer conducted performance review, Contract change control system, Claims administration, Inspections & audits, Records management system, Performance reporting, Payment system, Information technology
- Contract Closure - PR - Public Relations - Procurement audits, Records management system
Tips for memorizing ITTO (PMBOK 4th Edition) - Part 2
Tips for ITTO - Part - 2
- Cost estimating - Daily PVR Cinema is A Boring Plan - Determine resource cost rates, Project management software, Vendor bid analysis, Reserve analysis, Cost of quality, Analogous estimating, Bottom up estimating, Parametric estimating
- Cost budgeting - CRPF - an indian police battalion - Cost aggregation, Reserve analysis, Parametric estimating, Funding limit reconciliation
- Cost control - Very Poor Performance in PMP exam Causes Failure - Variance management, Performance measurement analysis, Project performance reviews, Project management software, Cost change control system, Forecasting
5. Project Quality Management -
- Quality Planning - D Comes After B & C - Design of experiments, Cost-benefit analysis, Additional quality planning tools, Benchmarking, Cost of quality
- Perform Quality Assurance - PQ - Process Analysis, Quality audits
- Perform Quality Control - Sensors Help In Detecting Fire & Cause Remote Sirens to Continously Play - Scatter diagram, Histogram, Inspection, Defect repair review, Flowcharting, Cause & effect diagram, Run chart, Statistical sampling, Control charts, Pareto chart
6. Project Human Resource Management
- Human Resource Planning - NOO - Networking, Organizational theory, Organization charts & position descriptions
- Acquire project team - Present NAV - Pre-assignment, Negotiation, Acquisition, Virtual teams
- Develop Project Team - Ground rules in Training & Team-building Generally Reduces Controversies - Ground rules, Training, Team building activities, General management skills, Recognition & rewards, Co-location
- Manage Project Team - COPI-er - Conflict management, Observation & conversation, Project performance appraisal, Issue log
Tips for ITTO - Part - 1
- Tools & Technique (T&T) - All the 7 processes in this knowledge area have Project Management methodology & Project management information system. Expert judgement is present in all the processes EXCEPT Direct & Manage project execution. Develop project charter has additional T&T - Project selection method and Monitor & control project work has additional T&T - Earned value technique.
2. Project Scope Management -
- Scope Definition T&T - PAES - Famous Indian tennis player - Product analysis, Alternatives identification, Expert judgement, Stakeholder analysis
- Scope Control T&T - VCR-C - Variance Analysis, Change control system, Replanning, Configuration management system
3. Project Time Management -
- Activity Definition T&T - PERT-D - Planning component, Expert judgement, Rolling wave planning, Templates, Decomposition
- Activity Sequencing T&T - SAPAD - Food in south indian language - Schedule network templates, Arrow diagramming method, Precedence diagramming method, Applying leads & lags, Dependency determination
- Activity Resource Estimating T&T - BEAP-P - Bottom up estimating, Expert judgement, Alternatives analysis, Published estimating data, Project management software
- Activity Duration estimating T&T - TRAP Ends - Three point estimates, Reserve analysis, Analogous estimating, Parametric estimating, Expert judgement
- Schedule Development - Project Schedule may Change With Agreed & Approved Stakeholder Scope Change Request - Project management software, Schedule network analysis, Critical path method, What-if scenario analysis, Applying calendars, Adjusting leads & lags, Schedule compression, Schedule model, Critical chain method, Resource leveling
- Schedule Control T&T - PSPSPV